Connect your data, understand your operations.
Bring in the spreadsheets, field forms and maps you already use, and see every site in one place.
Enter your project and control plot numbers to run the performance benchmark Verra’s VM0047 methodology sets for area-based projects, or your survey counts for the common-practice test census-based projects take. Regulatory surplus and the investment analysis are separate.
Passes: project plots grew significantly faster than their controls
The benchmark is the control slope divided by the project slope; the rest of the measured growth counts as the project’s. Area-based projects also need regulatory surplus, and an investment analysis if they have revenue or financial incentives other than carbon credit sales.
About 8,280 t CO2e after the benchmark and uncertainty deduction
MIN(12,000, 12,000 × (1 − 0.25)) × (1 − 8%) = 8,280 t CO2e. The uncertainty deduction is the confidence half-width minus 10 percentage points, floored at zero. Neither the benchmark nor the deduction shrinks a stock loss.
This is the total since the project start (Equation 32), before leakage (VMD0054), project emissions and the buffer pool. From the second verification on, subtract the previous verification’s total to get this one’s.
Illustrative arithmetic from VM0047 v1.1, checked 1 November 2026. Your validation and verification body decides whether the project is additional, from your full evidence.
Run one part of Verra VM0047’s additionality assessment for a reforestation (ARR) project: the Z test and performance benchmark for area-based projects, or the 15% common-practice test for census-based ones, with what the benchmark leaves of measured growth.
Read the guide: Additionality for reforestation projects, explained
Example: input
Project slope 0.04 (SE 0.006) · control slope 0.01 (SE 0.004) · stock change 12,000 t CO2e · half-width 18%
Example: output
Passes: Z = 4.16 (|Z| ≥ 1.96), performance benchmark 0.25, 75% of growth credited 12,000 × 0.75 × (1 − 8%) = 8,280 t CO2e With a control slope of 0.032 (SE 0.006): Z = 0.94, not significant, benchmark 1, no growth counts
With a dynamic performance benchmark. Each project plot is matched to control plots outside the project that looked the same in satellite data before it started. At every verification the yearly growth in stocking index of both groups is compared with a Z test. If the project grew significantly faster (|Z| of 1.96 or more), the benchmark is the control slope divided by the project slope, and the rest of the measured growth can be credited.
If project and control plots don’t differ significantly (|Z| below 1.96), the performance benchmark is set to 1 and no growth counts. Equation 32 subtracts the previous verification’s result, so a fail right after a credited verification is negative. The project is not cancelled: the test runs again at the next verification with every year of monitoring so far.
The share of similar landowners in the defined geographic area who already do the project activity, with data from within five years of the start date: from a representative survey, counting those without carbon finance, or from qualifying public statistics, which count all adopters. At 15% or more it is common practice and not additional. Census-based projects also need regulatory surplus and an investment analysis.
No. The calculation runs in your browser, and the numbers you enter stay there.
Bring in the spreadsheets, field forms and maps you already use, and see every site in one place.