Connect your data, understand your operations.
Bring in the spreadsheets, field forms and maps you already use, and see every site in one place.
Credits per hectare, costs, payback year and break-even size, from your area and credit price.
6.3 credits per hectare a year; $1.3M of costs over 30 years; the project pays back in year 20.
| Trees remove | 11.5 | |
| − Baseline | −1.2 | |
| − Uncertainty | −1.0 | |
| − Leakage | −0.5 | |
| − Buffer pool | −1.4 | |
| After deductions | 7.5 |
tCO₂e per hectare a year, while the forest is young. One credit is one tonne of CO₂ removed.
| Year | Credits issued | Revenue | Costs | Cash so far |
|---|---|---|---|---|
| 1 | – | – | $447,000 | -$447,000 |
| 2 | – | – | $10,000 | -$457,000 |
| 3 | – | – | $10,000 | -$467,000 |
| 4 | – | – | $10,000 | -$477,000 |
| 5 | 18,630 | $279,450 | $56,785 | -$254,335 |
| 6 | – | – | $20,000 | -$274,335 |
| 7 | – | – | $20,000 | -$294,335 |
| 8 | – | – | $20,000 | -$314,335 |
| 9 | – | – | $20,000 | -$334,335 |
| 10 | 18,630 | $279,450 | $66,785 | -$121,670 |
| 11 | – | – | $20,000 | -$141,670 |
| 12 | – | – | $20,000 | -$161,670 |
| 13 | – | – | $20,000 | -$181,670 |
| 14 | – | – | $20,000 | -$201,670 |
| 15 | 18,630 | $279,450 | $66,785 | $10,995 |
| 16 | – | – | $20,000 | -$9,005 |
| 17 | – | – | $20,000 | -$29,005 |
| 18 | – | – | $20,000 | -$49,005 |
| 19 | – | – | $20,000 | -$69,005 |
| 20 | 18,630 | $279,450 | $66,785 | $143,660 |
| 21 | – | – | $20,000 | $123,660 |
| 22 | – | – | $20,000 | $103,660 |
| 23 | – | – | $20,000 | $83,660 |
| 24 | – | – | $20,000 | $63,660 |
| 25 | 9,720 | $145,800 | $64,736 | $144,725 |
| 26 | – | – | $20,000 | $124,725 |
| 27 | – | – | $20,000 | $104,725 |
| 28 | – | – | $20,000 | $84,725 |
| 29 | – | – | $20,000 | $64,725 |
| 30 | 9,720 | $145,800 | $64,736 | $145,789 |
Running a carbon project? Restoration Scope keeps your plots, field measurements and verification evidence in one place. See how
Defaults sit inside the ranges published sources give. Replace them with your own quotes: they move the answer more than anything else here.
Our assumptions
A planning estimate from published defaults, checked 1 November 2026. Your plots, your methodology expert and your validation and verification body set the credits a project earns; quotes from them set its costs.
Estimate how many carbon credits a reforestation project earns per hectare, what it costs to get there (design, validation, verification, planting, registry fees), when it pays back, and the area at which its fixed costs pay off. Every default is editable and shows its source, or says it is our assumption.
Read the guide: How many carbon credits does a hectare of reforestation earn? · What a reforestation carbon project costs
Example: input
Tropical moist forest regrowth in the Americas · Verra · USD 15 a credit · 30 years · default costs · 100 ha, then 2,000 ha
Example: output
About 6.3 credits per hectare a year 100 ha: 18,792 credits, −USD 534,842 after 30 years, does not pay back within 30 years 2,000 ha: 375,840 credits, USD 2,698,157 after 30 years, pays back in year 10 Break-even: about 415 ha
With IPCC default growth for the young tropical forests in the calculator and our example deductions, about 4 to 8 credits a hectare a year over the first 20 years, and fewer after. A fast plantation such as teak can earn about 12. Your own plots set the real number.
Studies from 2011 and 2014, the latest primary figures we found, put feasibility, the project design document and validation at about USD 45,000 (the low end of Forest Trends’ ranges) to 305,000 (Pearson and colleagues’ largest case) before the first credit, and each verification at about USD 30,000 to 50,000, plus registry fees. Assisted regrowth adds about USD 230 to 1,260 a hectare and planting about USD 220 to 2,260 (2011 USD, including the first years of care).
Big enough for its credits to pay the costs that don’t grow with area. With the default costs, which sit inside the published ranges, and USD 15 a credit, a tropical regrowth project under Verra breaks even at about 415 hectares, and at about 230 to 550 hectares across the published ranges for those costs. Grouped projects share them across many landholders.
No. The calculation runs in your browser, and the numbers you enter stay there.
Bring in the spreadsheets, field forms and maps you already use, and see every site in one place.